三和建筑私人有限公司Structural steel contractor since 2008

Installation of Structural Steel Works (for Blasting Chaber 04, Pipe Fabrication Workshops 1-4 and Mobile Sheds) at New Shipyard Phase 3A at Tuas Shouth

Permanent StructureSep 2019 – Aug 2019