Permanent StructureContract T209 Construction of Lentor Station for Thomson East Coast LineMar 2018 – Dec 2019
Permanent StructureProposed Development of Changi East to Effect 3 – Runway Operations at Singapore Changi Airport – Package 1Jul 2016 – Dec 2019
Permanent StructureInstallation of Structural Steel Works (for Blasting Chaber 04, Pipe Fabrication Workshops 1-4 and Mobile Sheds) at New Shipyard Phase 3A at Tuas ShouthSep 2019 – Aug 2019
Permanent StructureProposed Mixed-Used Commercial Development Comprising Shopping Office/Residential and Carparks with Airpspace/Subterranean Connections across Sims Ave at Paya LebarDec 2016 – Mar 2019